EN
АО «Трест Гидромонтаж»

+7 (499) 191-00-01

+7 (495) 788-96-77

info@aothm.ru

Инновационная деятельность


  Стена в грунте_1-66proc.jpg


THE CONSTRUCTION OF RUN-OF-RIVER (EARTH-FILL) DAM WITH THE USE OF WATERTIGHT ELEMENT ERECTED BY “SLURRY WALL” METHOD USING BORED-SECANT CLAY-CEMENT CONCRETE PILES.
The report of Vladimir A. Redkin - Project Engineering Director of Trust Hydromontazh JSC (on the First international congress and exhibition "Hydropower. Caspian and Central Asia", Tbilisi, Georgia).